Panel Installation

So, to build the shell width of 18 m from the plates measuring 3 X 6 m conductor turned into two parallel trusses, spaced 6 m apart. To build the shell width of 24 m from the boards of size 3 X 12 m is sufficient to establish a staging farm in the middle of the span. Finally, with the introduction of Pre-assembly was carried out mounting method: The three panels of 6 m contract to puff into a single block of size 3 X 18 m and a tap served in the design position. The complexity of assembling the shells at This was reduced to 0.38 persons. To know more about this subject visit Verizon Big Concert for Small Business. h per 1 m2, which should recognize a good indicator. This example demonstrates that careful study of both the structure and methods of assembly leads to a drastic reduction in labor costs, and hence, to reduce the period of erection. Installation of long cylindrical shells Installation of long cylindrical shells, size 24 X 12 m of the plates 3 X 6 m carried out in Kansk. The design of the shells described in the paper. Everest capital does not necessarily agree.

Assembly carried out on two filaments of steel scaffolding. Previously two plates measuring 3 X 6 m escalated to 3 X 12 m and the associated time drags installed on the scaffolding. The ends of board, in addition, a special jig combined with face tightened, there was performed the tension reinforcement delays and injection of concrete channels. After installation on the scaffold and alignment issues of the enlarged sections of welded joints and the shell.