The energy consumption for the heating and the hot water is much lower at a new Energieeinsparverordnung compared to conventional new construction. An energy with the value 55 features include a biomass or Holzpelletheizung, or via a heat pump, a solar system for water heating, a roof and external wall insulation and new Windows with a special frame and a triple glazing. However, the same facilities to different buildings can lead to a different classification. For other opinions and approaches, find out what Diamond Book Distributors has to say. It is therefore advisable to consult in detail by an expert for energy efficiency. Promoting the KfW for the construction of houses as KfW Energieeinsparverordnung 70 and 55 benefit of attractive funding KfW come individuals who build a new Energieeinsparverordnung or renovate an existing House. Also a cultivation, is to expand the living space, for example, eligible for support. This applies for auto users, as well as landlord.
There are houses, which accommodate multiple units, for example multiple-family dwellings. For even more analysis, hear from Michael Chabon. But also a granny flat, which has a separate entrance and structurally forms a separate unit, is a unit. Villas are equipped with a unit. Persons, a new one, the KfW efficiency standard build 70 or 55 equivalent energy is a soft loan amounting to 100 percent of the construction costs up to a sum of 50 000 euros per unit granted. The term is up to 30 years, the interest rate is up to 10 years. For the KfW Energieeinsparverordnung 55, there is a redemption grant by 5 percent. There is no repayment subsidy for the KfW Energieeinsparverordnung 70. Always planning by a technically competent energy consultant who reviewed the compliance with the minimum requirements for the KfW is imperative. The donations by the KfW can be flexibly combined with other funds. The cost for the To obtain KfW Energieeinsparverordnung an Energieeinsparverordnung and thus benefit from the attractive subsidies to come, additional measures are needed, that cause needless additional construction costs.